Friday, July 10, 2020

Plant- Microbial fuel cell: Generating electricity from green, living plants

This article is by

Share this article

Article Contributor(s)

Charvi Trivedi

Article Title

Plant- Microbial fuel cell: Generating electricity from green, living plants

Publisher

Global Views 360

Publication Date

July 10, 2020

URL

Marshland near Blythburgh. View over the tidal River Blyth

Marshland near Blythburgh. View over the tidal River Blyth  | Source:  Eileen Henderson via Wikimedia

Humans are capable of discovering and creating great things with the help of science and one such impressive discovery is that green, living plants can generate electricity. It may seem unbelievable, but not impossible.

One must be wondering how this technology works. Well, the answer is quite simple; photosynthesis. Plants excrete organic matter into the soil as a result of photosynthesis. Only some of the organic matter is used by plants and the rest is released in the soil. This released organic matter is broken down by bacteria. In the breakdown process, electrons are released as a waste product. Since the movement of electrons produces electricity, these electrons, which are of no use to the plant, can be harvested. The best part about this innovation is that the plants from which energy is being generated are not affected in any way.

This idea was first put into use by a Dutch start-up called Plant-e. This company was launched in September 2009 and is successful in launching and selling many environment- friendly products like DIY kits to the public for experimentation purposes and modular systems which could be easily installed on green roofs for abundant electricity production. Plant-e is involved in various projects, within The Netherlands, like automatic lighting systems in gardens and many more.

This technology works with the plants which thrive in moist soils and where the water is present in abundance. Therefore marshlands, paddy fields and deltas are some of the most suitable places for setting up plant batteries as a huge amount of water is present in those areas. Hence, the use of this technology is limited to certain geographic areas containing moist soils and cannot be used in arid regions. It may, however, promote the growth of more trees and plants which will gradually reverse the malicious effects of global warming.

Another obstacle in widespread adoption of this technology in today’s time is the high cost of installation of the system. The initial adopters of this technology are those who are attracted by the efficiency and eco-friendly nature of the plant batteries and willing to pay a premium for it.

The concept of plant batteries can be further taken into rural areas where most of the population still does not have access to adequate electricity. It is estimated that plant-MFC technology can cover upto 20% of European Union’s primary future electricity needs. Also, plants are almost 100% efficient at converting photons from sunlight into electrons which indicates a bright future for this technology. However, more research needs to be done in this field.

Another innovation in the field of green electricity is using algae , which often grows in ponds and rivers, for generating electricity. The basic concept which explains the working is similar to the way plants are able to produce electricity; photosynthesis.

Various other ventures in the field of renewable energy also include vegetable batteries, meaning, electric power generated from fruits and vegetables like lemons, tomatoes and potatoes, have been investigated. According to experiments, at least 3 to 4 vegetables are required just to light a small LED bulb. Moreover, it leads to poisoning of the vegetables and those food products need to be thrown away, without being useful for consumption purposes. It is therefore not a viable option for energy production.

Plant based electricity generation is still an evolving technology which has immense potential for producing energy in an environmentally sustainable way. It will realise full potential when the installation cost is attractive enough for the farmers to prefer it over the electricity grids or fossil fuel based personal electricity generator sets.

Support us to bring the world closer

To keep our content accessible we don't charge anything from our readers and rely on donations to continue working. Your support is critical in keeping Global Views 360 independent and helps us to present a well-rounded world view on different international issues for you. Every contribution, however big or small, is valuable for us to keep on delivering in future as well.

Support Us

Share this article

Read More

February 4, 2021 5:06 PM

Environmental Impact Assessment (EIA) 2020: Why the draft is being opposed in India?

The Ministry of Environment, Forest and Climate Change (MoEFCC) sent a shockwave through the country when it released the Environmental Impact Assessment 2020 draft notification on March 12, 2020, amending the 2006 version.

The EIA serves as a means for the industries to obtain environmental clearances for their projects. The proposed projects are brought in front of the concerned public to be discussed and debated. If the projects proposed by the industries disturb the ecology and people living in that particular area to a large extent, then the Government cannot give permission for the project to continue.

There are several things included, or excluded, in the 2020 version which have enraged environmentalists, nature lovers and numerous concerned citizens across India.

Firstly, it includes post-facto approval. This means that any factory which has already begun with construction, will get a clearance, irrespective of the environmental damage it has already caused. However, the owners of the concerned factory will have to pay a fine of a certain amount.

Secondly, the new draft notification is released only in Hindi and English. Considering the lingual diversity of India, the communities which are not fluent in either languages will not know what the notification is about. This will reduce transparency and the livelihoods of such communities might get demolished without any warning.

The 2006 notification made it mandatory for every company involved in a project to submit a report every six months, verifying that the company is working within the terms of the granted permission and not going overboard with the available resources. The 2020 draft has extended the timeline of report submission once in twelve months. Moreover, certain projects like expansion of highways and road construction through forests are exempted from getting clearances.

Himalayan foothills, Sikkim, India | Source: Flowcomm via Flickr

Such features of the 2020 draft violate norms of the Environmental Protection Act (EPA, 1986) and also indicate that the scales are tipping dangerously towards the big industries, at the cost of our planet’s health. Livid cries have erupted from the people, especially those living in North-Eastern India and foothills of the Himalayas.

Himalayan ecology is at the brink of fragility and it requires stringent monitoring laws, the opposite of what EIA 2020 offers. "The Himalayan region today is in the most vulnerable position with massive climate-induced disasters, increasing deforestation, loss of biodiversity etc. Amending environmental norms will accelerate the ecological crisis in the Himalayas" says Ravi Chopra, a renowned environmentalist from Dehradun.

Since the draft has not come out in regional languages, the Karnataka High Court restrained the government from publishing the final document till it was accessible to a wider audience.

Although the government extended the deadline from June 30 to August 11, 2020, for the general public to pool in their opinions through emails, it shut down three main online websites on which youngsters of this country protested against EIA 2020. “We reasonably have a clear basis, based on our correspondence as well as our technical analysis, that this was a domain seizure by the government of this website” says Apar Gupta, executive director of Internet Freedom Foundation (IFF).

The EIA 2020 amendment does not do justice to the fundamental principles of environmental impact assessment and is more focussed in easing the clearance for the industries than the protection of the environment.

Economic growth, no doubt is important, more so at this trying time. However we should also bear in mind the cost which is to be paid for it, sooner or later.

Read More